Phase 1: Pre-Design Benchmarking
Before a single drawing is produced, establish your LEED target level and identify the point categories most achievable given the project typology and site constraints.
Phase 2: Integrated Design Process
LEED rewards integrated design. Bring your mechanical, electrical, and plumbing engineers into the design process from day one.
Phase 3: Construction Documentation
Commissioning documentation is the most frequently overlooked requirement. Assign a dedicated LEED Coordinator on-site from groundbreaking.
Common Pitfalls
The three most common reasons for credit denial are: inadequate commissioning documentation, failure to meet minimum ventilation prerequisites, and incorrect energy modeling assumptions.